Putting the finishing touches on the Sage Trail on Saturday after it was leveled, smoothed and narrowed by the SWECO trail bulldozer. This is how the trail looked before the volunteers smoothed it out.
|
||
Image 13 of 194 |
|
Image 13 of 194
|