 |
The tools are lined up, waiting for all the volunteers to arrive
|
|
|
 |
We ended up with 15 volunteers
|
|
 |
Starting towards the work area
|
|
|
 |
The bottom of the Space Mtn singletrack, where we'll start and work our way up.
|
|
 |
Steve demonstrates how to clean out a drainage dip filled with sediment. You start with a pick-mattock to loosen up the dirt if it's packed down (which it was!)
|
|
|
|
|
|
 |
Step one - loosen the dirt with a pick-mattock
|
|
 |
Step 2 - clean out the loose dirt with a Mcleod
|
|
|
|
|
|
|
 |
As well as cleaning drains, we pulled out some bothersome yuccas (and aren't they ALL bothersome?)
|
|
|
 |
The drainage channel needs to be extended off the trail.
|
|
|
|
 |
A newly refurbished drain
|
|
|
|
 |
There were a few sections where brushwork was needed
|
|