Maintaining the Los Robles Trail - West ("Space Mountain") in Thousand Oaks on March 22, 2008

The trailwork was organized by the Santa Monica Mountains Trails Council.
Photos of VenturaCountyTrails. Click on an image to see it full size.

Photos Home   | Next Page

IMG_7734.jpg
Digging through the berm (ridge on outside of the trail) to make a channel for water to drain off
IMG_7736.jpg
The dirt is pretty hard but the pick-axe makes quick work of it
IMG_7739.jpg
Chopping down the berm to make the trail slope outward and to widen the useable surface
IMG_7741.jpg

IMG_7743.jpg

IMG_7744.jpg

IMG_7747.jpg

IMG_7749.jpg

IMG_7750.jpg
A lot of progress is made in just 20 minutes!
IMG_7753.jpg
The finished drainage channel. The log was later removed from the top because those are now recognized as trail hazards. Several years ago, all these waterbars were removed from this trail.
IMG_7757.jpg
Digging another drainage channel
IMG_7762.jpg
Using a rock bar to remove large rocks from the middle of the trail, and filling in the rut with dirt from the berm
IMG_7764.jpg
Filling in the center rut and smoothing the trail
IMG_7767.jpg

IMG_7769.jpg
Pete is chopping out a tough stump...
IMG_7770.jpg
... Now grasp tightly and pull...
IMG_7773.jpg
... Success!
IMG_7775.jpg
Smoothing and widening a very rocky stretch
IMG_7776.jpg
The rocks from the inside and center of the trail are removed and the berm on the outside is cut down
IMG_7777.jpg
Prying out a rock with a rock bar
IMG_7778.jpg
Pick-axes are used to remove the berm
IMG_7783.jpg

IMG_7785.jpg

IMG_7787.jpg
Sloping the trail to the outside so that water will run off it, rather than down the middle where it will make a rut

1 2